Land surveying records the real dimensions, boundaries and levels of a site before design begins. Setting out then transfers the approved drawings onto the ground, so the building is placed exactly where it was designed. SLV carries out both with its own team.
Total station survey on a plotLand surveying
Key services
Plot measurement and boundary identification
Topographical surveys of existing features, trees, structures, drains and road edges
Contour mapping and ground-level records
Elevation measurements for plinth, drainage and road levels
Construction setting out of centre lines, column positions and the building footprint
Reference points and benchmarks for levels throughout construction
Why survey first
The plot on the ground can differ from the documents. Real dimensions, corners and levels decide where the house sits, how rainwater drains and how high the plinth should be.
Setting out on site
Survey the plot, then mark the column grid and footprint on the ground with lime, timber pegs and string lines.
Soil testing
For foundation design, ask about soil testing alongside the survey. It shows the ground conditions the structure will sit on.
Why it matters
A building set out a few centimetres wrong, or a plinth fixed at the wrong level, is difficult to correct once foundations are cast. Reliable survey data supports an accurate design, proper drainage and precise execution on site.
Related work
On site and in the studio
Play filmLayout development: drainage, UGD, CC roads, septic tanks and parksSite work · Land development Play filmFootings and column startersSite work · Foundations Play filmExterior elevation walkthrough3D design study
Common questions
Questions about land surveying & setting out
Does SLV do the land survey itself?
Yes. SLV’s own team surveys the plot and marks the site, so the measurements used in the design are the ones the site team builds from.
Why do I need a survey if I have the plot documents?
Documents may not show the exact dimensions, levels or what is on the plot today. A survey checks them on the ground before design and construction begin.
When is site marking done?
After the floor plan and structural drawings are agreed, just before excavation, so the foundations are placed exactly as drawn.
Project consultation
Ready to Build Your Dream Project?
Share your plot details and location. Our team will help you plan, design and build with confidence.